How do I bid for the property?
1
Contact us using the form provided below.
2
Make an appointment for a Physical or Virtual property viewing.
3
Read through the Auction Documents and Bidding Terms & Conditions.
4
Register bidder's particulars and proceed with deposit payment via online banking/FPX.
5
Receive access pin code to bid at the Live Auction.
Agricultural Land [Land with Ready 3 Fishing Ponds]
Leasehold
Property Details 231
Property Address
Lot 20633, Ulu Semie, Mukim Pelangai, Bentong, Pahang
Land Area
Approx. 2.50 Acres
Auction Details
Starting Bid
RM 281,200 (Approx. RM 3 per sq.ft)
Live Auction
18th Sep 2025 (Thu) 11.00 AM
Bidding Deposit
3% of Starting Bid
(Bidding Deposit, if made via online transfer, must be deposited directly into our company's bidder deposit account only. We have not authorised any 3rd party to receive the same on our behalf.)
Reasons to Buy
About the Property
✔ Perfectly set up for a profitable aquaculture or recreational fishing business.
✔ Three fully prepared ponds ready for immediate use.
✔ Ideal clay-based soil retains water effectively, making it excellent for fish and prawn farming.
✔ Surrounded by a lush, green environment that supports a healthy and natural aquatic ecosystem.
✔ Reliable water supply established through a natural water dam, rainwater collection, and a borehole system.
✔ Ponds equipped with built-in inflow and outflow systems for easy water management.
✔ Ready-to-operate infrastructure includes 600m of underground piping and culvert installations—saving you significant time and cost.
✔ Open-air layout with ample sunlight promotes algae growth, a natural food source for fish.
✔ Located in a non-flooding area, ensuring the long-term safety of your investment.
✔ Existing secure access road ensures smooth transport and logistics.
Reasons to Buy
✔ More than just land—this is a turnkey business opportunity.
✔ Business diversification: Profitable fishing and aquaculture venture.
✔ Resource optimisation: Start generating income immediately with existing facilities and infrastructure.
✔ Ready to operate: Ponds, pipelines, and culverts are already in place, allowing operations to start without lengthy construction delays.
Accessibility:
✔ Easily reachable from Jalan Karak-Tampin
✔ Upcoming CSR Highway (expected completion in 2026) – Only 20 mins from Karak to Campsite